| Обозначение | Заглавие на русском языке | Статус | Язык документа | Цена (с НДС 20%) в рублях |
|
|
Petroleum and natural gas industries—Material for use in H2S-containing environments in oil and gas production—Part 3:Cracking-resistant CRAs(corrosion-resistant alloys)and other alloys
|
Published |
|
На языке оригинала
|
5141,00
|
|
|
|
Measurement method for cathodic protection parameters of buried steel pipelines
|
Published |
|
На языке оригинала
|
2333,00
|
|
|
|
Petroleum and natural gas industries—Procedures for testing casing and tubing connections
|
Published |
|
На языке оригинала
|
1037,00
|
|
|
|
Measurement of natural gas flow by turbine gas meters
|
Published |
|
На языке оригинала
|
2808,00
|
|
|
|
Petroleum and netural gas industries—Downhole equipment—Lock mandrels and landing nipples
|
Published |
|
На языке оригинала
|
2117,00
|
|
|
|
Petroleum and natural gas industries―Progressing cavity pump systems for artificial lift―Part 1: Pumps
|
Published |
|
На языке оригинала
|
5659,00
|
|
|
|
Downhole equipment for petroleum and natural gas industries - Progressing cavity pump systems for artificial lift - Part 2: Surface-drive systems
|
Published |
|
На языке оригинала
|
3024,00
|
|
|
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 1: General requirements and recommendations
|
Published |
|
На языке оригинала
|
6912,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 2: Unbonded flexible pipe systems for subsea and marine applications
|
Published |
|
На языке оригинала
|
5270,00
|
|
|
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 3: Through flowline (TFL) systems
|
Published |
|
На языке оригинала
|
3974,00
|
|
|
|
Petroleum and natural gas industries―Design and operation of subsea production systems―Part 4: Subsea wellhead and tree equipment
|
Published |
|
На языке оригинала
|
7646,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5: Subsea umbilicals
|
Published |
|
На языке оригинала
|
6696,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 6:Subsea production control systems
|
Published |
|
На языке оригинала
|
5659,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 7:Completion/workover riser systems
|
Published |
|
На языке оригинала
|
7344,00
|
|
|
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 8: Remotely Operated Vehicle (ROV) interfaces on subsea production systems
|
Published |
|
На языке оригинала
|
3974,00
|
|
|
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 9: Remotely operated tool (ROT) intervention systems
|
Published |
|
На языке оригинала
|
1858,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 10: Specification for bonded flexible pipe
|
Published |
|
На языке оригинала
|
3715,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 11:Recommended practice for flexible pipe
|
Published |
|
На языке оригинала
|
7776,00
|
|
|
|
Petroleum and natural gas industries—Design and operation of subsea production systems—Part15:Subsea structures and manifolds
|
Published |
|
На языке оригинала
|
3715,00
|
|
|
|
Measurement of natural gas flow by means of standard orifice meter
|
Published |
|
На языке оригинала
|
5443,00
|
|
| Страницы: 1 / 2 / 3 / 4 / 5 / 6 / 7 / 8 / 9 / 10 |