| Обозначение | Заглавие на русском языке | Статус | Язык документа | Цена (с НДС 22%) в рублях |
|
|
Industrial-process measurement and control-Evaluation of system properties for the purpose of system assessment-Part6:Assessment of system operability
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Industrial-process measurement and control-Evaluation of system properties for the purpose of system assessment-Part7:Assessment of system safety
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Industrial-process measurement and control-Evaluation of system properties for the purpose of system assessment-Part8:Assessment of non-task-reated system properties
|
Published |
|
На языке оригинала
|
1778,00
|
|
|
|
Test conditions for machining centres - Part 1: Geometric tests for machines with horizontal spindle and with accessory heads (horizontal Z -axis)
|
Published |
|
На языке оригинала
|
3805,00
|
|
|
|
Test conditions for machining centres - Part 2: Geometric tests for machines with vertical spindle or universal heads with vertical primary rotary axis (vertical Z-axis)
|
Published |
|
На языке оригинала
|
2895,00
|
|
|
|
Test conditions for machining centres - Part 4: Accuracy and repeatability of positioning of linear and rotary axes
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Test conditions for machining centres - Part 5: Accuracy and repeatability of positioning of work-holding pallets
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Test conditionsfor machining centres--Part 6:Accuracy of feedsпјЊspeeds and interpolations
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Test conditions for machining centres - Part 7: Accuracy of a finished test piece
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Test conditions for machining centres--Part 8:Evaluation of the contouring performance in thethree coordinate planes
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Test conditions for machining centres - Part 9: Evaluation of the operating times of tool change and pallet change
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Test conditions for machining centres—Part 10:Evaluation of thermal distortions
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Electric resistance welding--Integrated transformers for welding guns
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Characteristics of electric infrared emitters for industrial heating—Part 1: Shortwave electric infrared emitters
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Characteristics of electric infrared emitters for industrial heating—Part 2: Mediumwave and longwave electric infrared emitters
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Preparation of steel substrates before application of paints and related products - Tests for the assessment of surface cleanliness - Part 2: Laboratory determination of chloride on cleaned surfaces
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Preparation of steel substrates before application of paints and related products-Tests for the assessment of surface cleanliness-Part 3:Assessment of dust on steel surface prepared for painting(pressure-sensitive tape method)
|
Published |
|
На языке оригинала
|
1199,00
|
|
|
|
Preparation of steel substrates before application of paints and related products--Tests for the assessment of surface cleanliness--Guidance on the estimation of the probability of condensation prior to paint application
|
Published |
|
На языке оригинала
|
1778,00
|
|
|
|
Preparation of steel substrates before application of paints and related products-Tests for the assessment of surface cleanliness-Part 5:Measurement of chloride on surfaces prepared for painting(ion detection tube method)
|
Published |
|
На языке оригинала
|
993,00
|
|
|
|
Preparation of steel substrates before application of paints and related products -Tests for the assessment of surface cleanliness - Part6: Extraction of soluble contaminants for analysis -The Bresle method
|
Published |
|
На языке оригинала
|
1199,00
|
|
| Страницы: ... / 41 / 42 / 43 / 44 / 45 / 46 / 47 / 48 / 49 / 50 / 51 / 52 / 53 / 54 ... / 126 |