| Обозначение | Заглавие на русском языке | Статус | Язык документа | Цена (с НДС 22%) в рублях |
|
|
Technical guide for smart substation
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Inspection specification for 1000kV power system protection relay and automation device
|
Published |
|
На языке оригинала
|
1778,00
|
|
|
|
Specification of operation management for power users 10kV substations and above
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Methods to quantify the steady state, power-frequency electrimagnetic fields generated by HV switchgear assemblies and HV/LV prefabricated substations
|
Published |
|
На языке оригинала
|
2688,00
|
|
|
|
On-site inspections method of a.c.circuit systems for 220 kV substations on plateau
|
Published |
|
На языке оригинала
|
2688,00
|
|
|
|
Guide to UV imaging detection of electrical equipments in high altitude regions-Part 1: Substations
|
Published |
|
На языке оригинала
|
2688,00
|
|
|
|
Communication networks and systems for power utility automation-Part 3: General requirements
|
Published |
|
На языке оригинала
|
4012,00
|
|
|
|
Communication networks and systems for power utility automation-Part 7-1: Basic communication structure-Principles and models
|
Published |
|
На языке оригинала
|
8148,00
|
|
|
|
Communication networks and systems for power utility automation-Part 7-2: Basic information and communication structure-Abstract communication service interfaceACSI
|
Published |
|
На языке оригинала
|
8644,00
|
|
|
|
Substation secondary system-Part 1General requirement
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Substation secondary system-Part 2: Data and model
|
Published |
|
На языке оригинала
|
2688,00
|
|
|
|
Substation secondary system-Part 3: Communication message specification
|
Published |
|
На языке оригинала
|
4673,00
|
|
|
|
Substation secondary system-Part 4:Cyber security protection
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Substation secondary system-Part 5: Protection and control system with their equipments requirements
|
Published |
|
На языке оригинала
|
1778,00
|
|
|
|
Substation secondary system-Part 6: Substation monitoring and control system
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Substation secondary system-Part 7: Centralized monitoring and control system of substationm
|
Published |
|
На языке оригинала
|
1572,00
|
|
|
|
Substation secondary system-Part 8:Preventing electric mal-operation
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Substation secondary system-Part 9:Construction specifications
|
Published |
|
На языке оригинала
|
1282,00
|
|
|
|
Substation secondary system-Part 10: Test and detection
|
Published |
|
На языке оригинала
|
1778,00
|
|
|
|
Communication networks and systems for power utility automation-Part 7-7Machine-processable format of IEC 61850-related data models for tools
|
Published |
|
На языке оригинала
|
3350,00
|
|
| Страницы: 1 / 2 |